Consultation with equipment suppliers:
They will provide specific area recommendations based on your choice of rig model and construction requirements.
Site survey:
Conduct a site survey to measure the dimensions of the site and assess the topography.
Drawing up a floor plan:
Draw up a floor plan according to the dimensions of the drilling rig and auxiliary equipment, and plan the working area.
Reserve enough space for access:
In addition to the drilling rig operation area, reserve enough space for access to facilitate the passage of vehicles and personnel.
Consider the safety distance:
the surrounding buildings, roads, etc. need to maintain a certain safety distance.
Pay attention to the environmental requirements:
the construction process of waste water, waste residue, etc. need to be properly handled to avoid pollution of the environment.
In short, the operating area of the water well drilling rig is a factor that needs to be considered comprehensively, without a fixed standard answer. When choosing a site, the above factors must be fully considered to ensure the smooth progress of construction.
Site flatness:
The flatter the ground, the smaller the area needed.
Site bearing capacity:
the weight of the rig and auxiliary equipment needs to be able to withstand the ground.
Surrounding environment:
Whether there are obstacles, buildings, etc. around will affect the operating space.
Construction process:
Different construction processes have different requirements for the working space.
If you don't know how to choose the right water well drilling rig, click the link below to contact our professional team directly.
Contact: Mr Chen
Phone: +86 18574606855
Tel: +86 746 8323309
Email: pearldrill02@guangzhouintl.com
Add: Shanhuxi Road, Chuangfacheng Plaza, Yongzhou City ,Hunan Province China