The procedure for replacing a replacement water well Drilling Rig is as follows:
STOPPING CHECK:
Verify that the rig is completely stopped and in a safe condition.
Dismantling:
1. According to the equipment manual, disassemble the loose parts to be replaced one by one.
2. Observe how and where each part is connected to facilitate subsequent assembly.
Cleaning:
1. Clean disassembled parts and mounting surfaces to remove dirt and rust.
2. Check other parts for wear or damage and replace them promptly.
Installation:
1. Install the new parts in their original positions, making sure that the fastening bolts are tight.
2. Check for proper installation against the equipment manual.
Reset:
Reset the other parts that have been disassembled and check that the connections are secure.
Trial run:
Start the drilling rig and carry out a low-speed test run to observe whether there is any abnormal sound or vibration.
1. Drill Bit: When replacing the drill bit, pay attention to whether the type and specification of the drill bit match.
2. Drill pipe: When replacing the drill pipe, pay attention to whether the connection of the drill pipe is firm to prevent it from falling off.
3. Hydraulic system components: When replacing hydraulic system components, pay attention to the cleanliness of the hydraulic oil and follow the prescribed sequence.
4. Motor: When replacing the motor, pay attention to whether the power, voltage and other parameters of the motor are matched.
If you don't know how to pick the right water well drilling rig, click the following link to contact our professional team
Contact us (gzpearldrill.com)
Contact: Mr Chen
Phone: +86 18574606855
Tel: +86 746 8323309
Email: pearldrill02@guangzhouintl.com
Add: Shanhuxi Road, Chuangfacheng Plaza, Yongzhou City ,Hunan Province China