Well Drilling Rig Wiki Knowledge

What is seasonal maintenance for water well drilling rigs

Acording to the climate characteristics of different seasons, the water well Drilling Rig to take targeted maintenance measures, can effectively improve the performance of the equipment and extend the life.
1. Spring Maintenance
Cleaning and inspection:
Remove soil, oil and frost left over from winter, and check for rusted parts.
Lubrication maintenance:
Refill lubricant for each transmission part to prevent insufficient lubrication due to the influence of low temperature in winter.
Hydraulic system inspection:
Check the hydraulic oil level and piping for leakage or aging due to cold weather.

2. Summer Maintenance
Cooling system maintenance:
Check whether the mud cooling system and diesel engine coolant are normal to prevent the equipment from overheating due to high temperature.
Lubricating oil check:
Under high temperature environment, pay attention to check the viscosity of lubricating oil and replace the high temperature resistant lubricating oil in time.
Dust maintenance:
The operating environment is dusty in summer, regularly clean the air filter, Mud Pump and other key parts to prevent clogging.

3. Fall Maintenance
Equipment cleaning:
After operation, thoroughly clean the drilling rig mud, rock chips and dust to prevent dirt accumulation.
Rust prevention treatment:
Apply anti-rust oil to rust-prone parts (e.g., drill pipe joints and bolts) to prevent rust caused by moisture in the alternating fall and winter.
System Inspection:
Test hydraulic oil, diesel fuel and circuit system in advance to prepare for winter operation.

4. Winter Maintenance
Antifreeze measures:
Replace the antifreeze to ensure the cooling system does not freeze.
Empty the water in the mud pipe after operation to prevent freezing and blockage.
Diesel engine maintenance:
Use low-temperature starting device or preheating equipment to ensure smooth low-temperature starting of diesel engine.
Lubrication Protection:
Use low-temperature lubricating oil to reduce the impact of the cold environment on the transmission system.
Storage Management:
When out of service for a long time, store the equipment indoors or cover it with a protective cover to avoid erosion by wind and snow.

Summarize
Spring focuses on cleaning and restoration; summer prevents heat and dust;
Fall focuses on cleaning and rust prevention; winter focuses on frost prevention and low temperature protection.

Adjust the maintenance program flexibly according to seasonal characteristics to ensure efficient operation and prolong the service life of the equipment.

water <a href=https://www.gzpearldrill.com/en/Water-well-drilling-rigs.html target='_blank'>well drilling rig</a>

If you don't know how to choose the right water well drilling rig, click the link below to contact our professional team directly.

Contact us

CONTACT US

Contact: Mr Chen

Phone: +86 18574606855

Tel: +86 746 8323309

Email: pearldrill02@guangzhouintl.com

Add: Shanhuxi Road, Chuangfacheng Plaza, Yongzhou City ,Hunan Province China