What is the commissioning work of hydraulic drilling rigs before construction?

Hydraulic Drilling Rig in the construction of careful debugging before work, is to ensure the normal operation of equipment, improve construction efficiency, to ensure the safety of an important link. 

water <a href=https://www.gzpearldrill.com/en/Water-well-drilling-rigs.html target='_blank'>well drilling rig</a>

The following is a detailed introduction to the commissioning of hydraulic drilling rigs before construction:

Hydraulic drilling rig commissioning work before construction
1. Check the hydraulic system
Fluid check: check whether the level of hydraulic oil in the prescribed range, whether the oil is clean, there are no impurities or emulsification.
Oil pipe inspection: check whether all the hydraulic oil pipe is intact, whether the connection is tight, there is no oil leakage phenomenon.
Hydraulic components check: check hydraulic pumps, hydraulic valves, hydraulic cylinders and other components work properly, there is no abnormal noise or leakage.
2. Check the mechanical transmission system
Transmission shaft inspection: check whether the transmission shaft is deformed, loose or cracked.
Gear check: check whether the gear is worn, missing teeth or loose.
Coupling check: check whether the coupling is loose or damaged.
Lubrication system check: Check whether the lubrication points are filled with sufficient lubricant.
3. Check the safety devices
Safety valve check: Check whether the safety valve is sensitive and reliable, and whether the setting pressure is correct.
Limit switch check: check whether the limit switch can effectively prevent the hydraulic cylinder over-travel.
Emergency stop device check: check whether the emergency stop device can quickly cut off the power.
4. Check the drilling tools
Drill Bit Check: Check the drill bit for sharpness, cracks or wear.
Drill pipe inspection: Check the drill pipe for bends, cracks or damaged threads.
Drilling tool connection check: Check whether the connection of each part of the drilling tool is firm.
Purpose of commissioning
Ensure the normal operation of the equipment: through commissioning, you can find and eliminate the hidden problems of the equipment at an early stage to ensure the normal operation of the equipment.
Improve construction efficiency: well commissioned equipment can improve drilling speed and drilling quality, and improve construction efficiency.
Ensure construction safety: commissioning can find and eliminate potential safety hazards to ensure the safety of construction personnel.
Summarize
The commissioning of hydraulic drilling rigs before construction is an important link to ensure the smooth progress of construction. Through comprehensive inspection and debugging of the hydraulic system, mechanical transmission system, electrical system, safety devices, etc., the reliability of the equipment can be ensured, the construction efficiency can be improved, and the construction safety can be ensured.

If you don't know how to choose the right water well drilling rig, click the link below to contact our professional team directly.

Contact us (gzpearldrill.com)

CONTACT US

Contact: Mr Chen

Phone: +86 18574606855

Tel: +86 746 8323309

Email: pearldrill02@guangzhouintl.com

Add: Shanhuxi Road, Chuangfacheng Plaza, Yongzhou City ,Hunan Province China