what precaution is needed before operating the drilling rig
Precautions when operating a water well Drilling Rig
1. Drilling rig workers must be specially trained and have a certain amount of work experience before they are allowed to work.
2. the drilling rig workers must master the operation essentials of the drilling rig and comprehensive maintenance knowledge, and have considerable experience in troubleshooting methods.
3. The drilling rig must be fully inspected before leaving the factory. All parts of the drilling rig must be complete, the cable must not leak, and the drill pipe and drilling tools must not be damaged.
4. the drilling rig must be loaded firmly, turn or slope must be slow and fixed with steel wire.
5. entering the construction site, the drilling rig tower must be fixed, the drilling site area must be larger than the drilling rig seat, and there must be enough safety space around.
6. When drilling, the hole position, orientation, angle and depth must be strictly observed, and the driller must not change them without authorization.
7. When installing drill pipe, the driller should check the drill rig to ensure that the drill pipe is not blocked, bent or worn. Unqualified drill pipes are strictly prohibited.
8. The hole distance must be measured accurately during drilling. Generally, the drill pipe must be measured once every 10 meters of drilling or when changing drilling tools to confirm the hole depth.