Truck Mounted Water Well Drilling rig

  • Truck mounted water well drilling rig
  • Truck mounted water well drilling rig
Truck mounted water well drilling rigTruck mounted water well drilling rig

Truck mounted water well drilling rig

  • Maximum drilling depth: 180m
  • Borehole diameter: 100-300mm
  • Operating air Pressure: 1-3.45mp
  • Drill Pipe Diameter: 50-89mm
  • If you are interesting at Truck mounted water well drilling rig,you can contact us with the inquiry button.
  • INQUIRY      whatsapp  WhatsApp

Description of Truck mounted water well drilling rig

Water well Drilling Rig is widely used in large, medium and small scale mining, hydropower, transportation, national defense engineering and other earth-rock excavation and blasting projects.

Product Model: ZCISOtruck   mounted water well drilling rig-180

Maximum drilling depth: 180m

Borehole   diameter: 100-300mm

Operating   air Pressure: 1-3.45MP

The   total gas consumption:  16-30   m3 / min

Run   Of Steel: 1.5m

Drill   Pipe Diameter: 50-89mm

Pressure   axial: 5 tons

lifting   power: 16 tons

Rotary   torque: 2000--4000mri

Rotary   speed: 0-80   RPM

Matched   power: 30kw/

Load-carry   duty: Single-drive   tractor

Walking   speed: 30KM/H

Dimensions: 3.6*1.6*2.1 m

Machine   weight: 5 tons


1. In general, drill 10 meters per drill or change the bit, measure the drill pipe once, check the depth of the drill-hole, and make necessary modifications. Check the gear box, bushing, vertical shaft teeth, etc., whether there is overheating, whether there is abnormal sound, if the problem is found, stop in time, find the cause, solve the problem.

2. When digging with clean water, do not supply water before digging. In addition, water can only be drilled after return. And make sure you have enough traffic.1. In general, drill 10 meters per drill or change the bit, measure the drill pipe once, check the depth of the drill-hole, and make necessary modifications. Check the gear box, bushing, vertical shaft teeth, etc., whether there is overheating, whether there is abnormal sound, if the problem is found, stop in time, find the cause, solve the problem.

3. Every time the drilling tool is changed, the drilling platform is generally required to measure every 10 meters to change the drilling depth. Even if the gear box bushing vertical shaft gear overheating phenomenon occurs, there will be no abnormal sound. If there is a problem, please stop immediately, investigate the cause and deal with it within the time.

Water well drilling rig is widely used in large, medium and small scale mining, hydropower, transportation, national defense engineering and other earth-rock excavation and blasting projects. It can also be used in port, channel and other underwater rock drilling and blasting operations. Percussive well drilling machine is widely used in drilling Wells with large diameter and deep hole operation such as geothermal air conditioning drilling.

Our company has a perfect after-sales service and maintenance network to provide customers with strong sales support, products favored by domestic and foreign customers