Water well drilling machine

  • Water Well Drilling Rig
  • Water Well Drilling Rig
Water Well Drilling RigWater Well Drilling Rig

Water Well Drilling Rig

  • If you are interesting at Water Well Drilling Rig,you can contact us with the inquiry button.
  • INQUIRY      whatsapp  WhatsApp

Description of Water Well Drilling Rig

Water Well Drilling Rig Troubleshooting

The lubricating oil of the new machine shall be replaced after 200h of use for the first time, 400h of use for the second time, and once after 600h of use.

Use light oil before filling new lubricating oil.

Clean the box.

After shutdown, the sludge on the surface of the drilling rig must be cleaned and covered properly with lubricating grease.

1575275089(1).jpg

image.png